← Back to all works
⚡ 158 words · 53 sec
PUBLIC
🛠 NETWORK OPERATIONS⚡ 15 SEC

We look at the papers and guess that maybe a mouse chewed the cable 🐭

A low-poly wood and paper penguin looking up at a ceiling cable where a tiny felt mouse peeks out
Guessing The Cause

Sometimes, while looking at the papers, I also work out the cause of the fault.

First Split

When the field worker arrives at the site, the first thing we do is the “first split”.

Measure The Light

To decide whether the fault is on the equipment side or the cable side, we measure whether the light signal, the optical power, is coming through properly.

Under 10 Metres

If no light is coming and the distance to the break is around 0 to 10 metres, then it is not the outside line, it is a problem inside the customer’s building.

Maybe A Mouse

At a site where the cable is run through the ceiling, the conversation sometimes becomes, “maybe it has been chewed by a mouse here”.

Measure Here Next

While the field worker is measuring on site, I look at the papers in front of me and narrow down the cause together with them, saying “please measure here next”.

Quite Fun

This feels a little like being a detective, and it is quite fun.